Excavation Crew — Learning Path
Everything the crew in and around the hole needs, in the order the job hands it to them
An excavation crew does four jobs that the standards treat as four separate subjects, and it does them in the same afternoon. The trench is 29 CFR 1926 subpart P. The manhole, vault or wet well at the end of the run is 1926 subpart AA or 1910.146. The trench box, the pipe and the plate that get picked and set are 1926.251 and subpart CC. And all of it happens in whatever weather the calendar handed you, with no shade and no shelter. This path puts the free courses on this site in that order, because that is the order the hazards arrive in: the hole first, then what the hole connects to, then what gets lowered into it, then the conditions it is dug in. Everything is free, nothing asks for an account, and nothing is issued at the end — the competent person designation that 1926.651(k) and 1926.652(b) rest on stays with your employer, and so does the entry authorization under 1926.1204.
What you will be able to do at the end
- Explain why protection starts at 5 feet, what changes past 20, and when the 1926.652(a)(1) exception for stable rock genuinely applies
- Classify soil the way the standard requires — one visual and one manual test, by a competent person, redone when conditions change
- Choose between sloping, benching, shoring and shielding for a given depth and soil type, and say which appendix or manufacturer tabulated data you are relying on
- Tell a confined space from a permit-required confined space, and recognize when the trench, the manhole or the vault has become one
- Test an atmosphere in the right order, isolate the space, and name what each of the three roles owes the entry
- Estimate a load, pick a hitch, read what the sling angle does to tension, and reject damaged gear on the spot
- Keep people out of the swing radius and the fall zone while a box or a length of pipe is being set
- Recognize heat and cold illness early in a crew that has no shade and no shelter, and write down the plan before the shift that needs it
How to use this path
- 1Take the courses in the order below. Each one assumes the vocabulary of the one before it — the first course explains what a competent person is, the second one uses the term without stopping.
- 2Do the 5-question quiz at the end of every part before moving on. If you miss two, reread that part: the quizzes exist to catch the chapters you skimmed.
- 3Finish each course with its 20-question final exam, then use the practice tests further down as a cold check a few days later.
- 4Your progress is stored in your own browser. No account, no email, nothing sent to us — and nothing to download at the end.
The path, step by step
Excavation & Trenching Safety
The hole is the hazard that kills, so it comes first. This course works through 29 CFR 1926 subpart P the way the job meets it: why the protection threshold is 5 feet and what a registered professional engineer has to do past 20, how soil actually gets classified into Type A, B and C and who is allowed to do it, and then the four protective systems and the tabulated data behind each one. Its last part is the one crews skip and inspectors do not — access and egress, spoil setback, water, atmosphere, traffic and the daily inspection that has to happen before each shift and after every rainstorm.
- Part 1 — Cave-ins: why 5 feet, and what changes past 204 chapters
- Part 2 — Soil classification and the competent person4 chapters
- Part 3 — Sloping, benching, shoring and shields4 chapters
- Part 4 — The hazards that come with the hole4 chapters
Confined Space Awareness
A trench is not automatically a confined space, but the manhole, vault, wet well, lift station and casing at the end of the run usually are — and the crew that dug down to them is the crew that gets asked to go in. Take this second because the atmosphere question arrives the moment the trench reaches an existing line: 1926.651(g) already made you test for oxygen deficiency and hazardous atmospheres in the excavation, and the structure at the end of it turns that into a full permit space with an attendant, an entry supervisor and a rescue arrangement.
- Part 1 — Confined space, or permit-required confined space?4 chapters
- Part 2 — Hazardous atmospheres and the order of measurement4 chapters
- Part 3 — Physical hazards, isolation and the three roles4 chapters
- Part 4 — Rescue, and why the rescuer becomes the second victim4 chapters
Rigging & Lifting Fundamentals
Trench boxes, slide rail, pipe, manhole sections, plate and pumps all arrive by machine, and the person guiding them in is standing in the one place nobody should be. This course gives the crew the part of rigging it actually uses: getting a real weight before the pick, choosing a hitch, understanding what the sling angle does to tension, and the removal criteria that let a laborer reject a sling without having to argue about it. It also covers keeping clear of the load, which is the paragraph the trench crew lives under while a box is being set.
- Part 1 — Knowing the load4 chapters
- Part 2 — Slings and hitches4 chapters
- Part 3 — Angles, tension and the D/d ratio4 chapters
- Part 4 — Hardware and removal criteria4 chapters
- Part 5 — Making the lift4 chapters
Heat & Cold Stress Prevention
An open cut has no shade in July and no shelter in January, and the crew is doing heavy work in PPE at the bottom of it. This course is last because it applies to every day of the other three: how the body gains and loses heat, what the heat index and WBGT each measure and where each one is honest, what acclimatization does over the first two weeks of a heat wave or a new hire's first fortnight, wind chill and the progression of frostbite, and how to recognize heat stroke and hypothermia in a coworker before he stops being able to tell you.
- Part 1 — How the body gains and loses heat4 chapters
- Part 2 — Heat: measuring it and controlling it4 chapters
- Part 3 — Cold: measuring it and controlling it4 chapters
- Part 4 — Recognize, respond and write it down4 chapters
Alongside the courses
Check yourself: free practice tests
Same standards, questions only. Every explanation cites the paragraph it comes from.
Bring it to the crew: printable toolbox talks
Five-minute talks on one page, ready to print for a tailgate meeting.
Do the math on the job
The numbers these courses talk about, worked out in your browser. Nothing you type leaves it.
The paperwork, filled in
Blank templates your employer still has to review and adapt.
Short reads that clear up the usual confusions
Who this path is for: Pipe and utility crews, sewer and water contractors, site and underground contractors, laborers and operators working in and around open cuts, foremen and crew leads, competent persons taking on excavation duties, and safety coordinators writing an excavation or entry program.
Frequently asked questions
Sources & references
- 29 CFR 1926 subpart P — Excavations (1926.650 to 1926.652 and appendices A to F)
- 29 CFR 1926 subpart AA — Confined spaces in construction (1926.1200 to 1926.1213)
- 29 CFR 1926.251 — Rigging equipment for material handling
- OSHA — Heat safety and health topics page, and the NIOSH criteria the published values come from
Content checked against these sources — last reviewed September 9, 2026.
Not OSHA-authorized training. SteelToeTools is not affiliated with, endorsed by, or authorized by OSHA or the U.S. Department of Labor. This free educational content does not satisfy any OSHA or other regulatory training requirement, and no card, certificate, or credential is issued. Only OSHA-authorized trainers can deliver OSHA Outreach Training (10-Hour and 30-Hour) and issue DOL cards. Always follow your employer's training program and applicable federal, state, and local requirements.