Record the excavation, the times it was inspected, the condition of each checkpoint and any corrective action taken, then print the form or download it as a PDF. Every line cites the paragraph of 29 CFR 1926 Subpart P it comes from, and a blank form prints just as cleanly for filling out by hand in the field.

Reclassify whenever the properties change — App. A (c)(4).
Must have the authority to take prompt corrective measures — 1926.650(b).
Inspections made today — 1926.651(k)(1)

Prior to the start of work, as needed throughout the shift, and after every rainstorm or other hazard-increasing occurrence.

Inspections made today: time, trigger and inspector
InspectionTimeTrigger / conditionsInspected by
Before the start of work
During the shift
After rainstorm or other occurrence

Nothing you type is sent to our servers. A draft is kept in this browser until you clear it.

Template for informational purposes only. This document must be reviewed and adapted by a competent or qualified person for your specific jobsite, equipment, and applicable federal, state, and local requirements. It does not constitute legal, engineering, or safety advice and does not by itself establish compliance with OSHA or any other standard. SteelToeTools assumes no liability for its use. Nothing you type is sent to our servers.

How to use this form

  1. 1
    Inspect before the crew goes in. 1926.651(k)(1) puts the first inspection prior to the start of work — not after the first load of pipe is set. Walk the whole length of the excavation and the ground behind the edge, not just the section being worked.
  2. 2
    Mark each checkpoint OK, Deficiency or N/A. Anything you leave blank prints as three empty boxes, so the form doubles as a clipboard sheet you fill out by hand.
  3. 3
    Pair every deficiency with an action. The corrective action table has a column for whether employees were removed from the hazardous area — that is the requirement in 1926.651(k)(2), and it is the line that matters most after an incident.
  4. 4
    Re-inspect after rain and after anything that changes the hazard. The third row of the inspection table exists for that. A trench that was fine at 7 AM is a different trench after an inch of rain.
  5. 5
    Print or download the PDF and sign it. One form per excavation per day. The dig permit is issued once — use the excavation and trenching permit generator for that — and the trench slope calculator gives the cut-back distance if the soil type changes on you.

What OSHA requires

29 CFR 1926.651(k)(1) is short, and every word of it drives the form above: “Daily inspections of excavations, the adjacent areas, and protective systems shall be made by a competent person for evidence of a situation that could result in possible cave-ins, indications of failure of protective systems, hazardous atmospheres, or other hazardous conditions. An inspection shall be conducted by the competent person prior to the start of work and as needed throughout the shift. Inspections shall also be made after every rainstorm or other hazard increasing occurrence. These inspections are only required when employee exposure can be reasonably anticipated.”

What the standard says, and where it lands on the form
The requirementWhat it means on siteOn this form
Excavations, the adjacent areas and protective systemsThe ground behind the edge and the spoil pile are part of the inspection, not just the holeGroups A and C
By a competent personAble to identify the hazards and authorized to take prompt corrective measures (1926.650(b))Header and signature
Prior to the start of workBefore anyone enters, every day the excavation is openInspection row 1
As needed throughout the shiftWhen the depth, the soil, the loads at the edge or the weather changeInspection row 2
After every rainstorm or other hazard increasing occurrenceRain, snowmelt, freeze-thaw, vibration, a new surcharge load, damage to a shieldInspection row 3
Possible cave-insThe signs of distress named in Appendix B: fissures, subsidence, slumping, bulging or heaving, spalling, ravellingGroup A
Indications of failure of protective systemsDamaged or displaced shoring and shields, a slope steeper than the soil allows, missing tabulated dataGroup B
Hazardous atmospheresTesting over 4 ft where one exists or could reasonably be expected; 19.5% oxygen, 20% of the LFLGroup E
Other hazardous conditionsEgress, spoil setback, utilities left exposed, traffic, mobile equipment at the edge, waterGroups C, D, E
Exposed employees removed from the hazardous area until precautions are taken (k)(2)The competent person stops the work — that authority is part of the definitionCorrective action table

The standard requires the inspection, not a particular form, and it sets no retention period. Keeping the record is a practical and contractual matter — many owners and general contractors require a daily form, and State Plan states may impose requirements beyond the federal standard.

Frequently asked questions

29 CFR 1926.651(k)(1) requires daily inspections of excavations, the adjacent areas and the protective systems by a competent person, conducted prior to the start of work and as needed throughout the shift, plus an inspection after every rainstorm or other hazard-increasing occurrence. These inspections are only required when employee exposure can be reasonably anticipated. In practice that is at least one inspection before the crew goes in each morning, more whenever the ground, the weather or the work changes.

No. Subpart P requires the inspection, not a form, and it sets no retention period. A written record is still the only practical way to show that the inspection happened, who made it and what was found — and it is what a compliance officer will ask for after an incident. Many general contractors and owners require a daily form by contract, and some State Plan states go further than the federal standard, so check your state rules.

1926.651(k)(1) names rainstorms explicitly and then covers any other hazard-increasing occurrence. In the field that means heavy rain or snowmelt, freeze-thaw, a rise in the water table, vibration from traffic, pile driving or compaction near the cut, a load placed near the edge, a change in the soil that shows up as the excavation deepens, damage to a shield or shore, or a nearby excavation or blasting operation. Each of those calls for a new inspection before anyone re-enters.

Where the competent person finds evidence of a situation that could result in a possible cave-in, indications of failure of protective systems, hazardous atmospheres, or other hazardous conditions, exposed employees must be removed from the hazardous area until the necessary precautions have been taken to ensure their safety (29 CFR 1926.651(k)(2)). That is why this form pairs every deficiency with a corrective action and a line recording whether employees were pulled out.

One who is capable of identifying existing and predictable hazards in the surroundings, or working conditions which are unsanitary, hazardous, or dangerous to employees, and who has authorization to take prompt corrective measures to eliminate them (29 CFR 1926.650(b)). Both halves matter: the knowledge to classify soil under Appendix A and to judge a protective system, and the actual authority to stop the work and pull the crew out.

Subpart P Appendix B uses the term distress for soil in a condition where a cave-in is imminent or likely, and names the phenomena that show it: fissures in the face of or adjacent to an open excavation, subsidence of the edge, slumping of material from the face, bulging or heaving of material from the bottom, spalling of the face, and ravelling — small amounts of material separating from the face and trickling down. This form lists each of them as its own checkpoint so none gets skimmed over.

Yes. Leave the checkpoints on the default blank status and every line prints with empty boxes for OK, deficiency and not applicable, so the form works as a clipboard sheet in the field. Fill it in on your phone or laptop instead and the boxes are marked for you, which is easier to read and to file.

No, they do different jobs. A dig permit is issued once, before the excavation is opened, and records the utility locates, the soil classification and the protective system chosen. This form is the daily record required by 1926.651(k)(1) for every day the excavation stays open — same excavation, new inspection. Our excavation and trenching permit generator covers the first, and both reference the same competent person.