Excavation & Trenching Practice Test
Twenty-five questions on excavation and trenching under 29 CFR 1926 Subpart P, with every answer traced to the paragraph it comes from — when a protective system is required and the only two exceptions, how soil gets classified by a competent person, the maximum allowable slopes in Table B-1, the difference between shoring and shielding, the way out at 4 feet, the 2-foot spoil setback, water in the trench, atmospheric testing, and the daily inspection. Questions state whether they are asking about a trench or any excavation, because Subpart P does not always treat them the same. This is a review tool: the training and the competent person your employer owes you are still required.
Not OSHA-authorized training. SteelToeTools is not affiliated with, endorsed by, or authorized by OSHA or the U.S. Department of Labor. This free educational content does not satisfy any OSHA or other regulatory training requirement, and no card, certificate, or credential is issued. Only OSHA-authorized trainers can deliver OSHA Outreach Training (10-Hour and 30-Hour) and issue DOL cards. Always follow your employer's training program and applicable federal, state, and local requirements.
Frequently asked questions
Sources & references
- 29 CFR 1926.650 — Scope, application and definitions
- 29 CFR 1926.651 — Specific excavation requirements
- 29 CFR 1926.652 — Requirements for protective systems
- 29 CFR 1926 Subpart P Appendix A — Soil Classification
- 29 CFR 1926 Subpart P Appendix B — Sloping and Benching
- OSHA 2226 — Trenching and Excavation Safety (2015)
Content checked against these sources — last reviewed August 28, 2026.