Rigging Gear Inspection Form Generator
Log the gear you inspected, work through the removal-from-service criteria that OSHA sets for each sling type, record what came out of service and sign the form, then print it or download it as a PDF. Every checkpoint cites the paragraph it comes from, and a blank form prints just as cleanly for filling out by hand at the gang box.
Nothing you type is sent to our servers. A draft is kept in this browser until you clear it.
Template for informational purposes only. This document must be reviewed and adapted by a competent or qualified person for your specific jobsite, equipment, and applicable federal, state, and local requirements. It does not constitute legal, engineering, or safety advice and does not by itself establish compliance with OSHA or any other standard. SteelToeTools assumes no liability for its use. Nothing you type is sent to our servers.
How to use this form
- 1List the gear by tag, not by description. “The green sling” is not a record. A tag or stamped ID is what lets you show, a year later, that the sling on the load was the one you inspected.
- 2Read the tag before you read the sling. 1926.251(a)(2) is blunt: rigging equipment shall not be used without affixed, legible identification markings showing the recommended safe working load. An unreadable tag is a removal, not a judgment call.
- 3Work the criteria for the sling types you actually have. Mark whole groups N/A rather than guessing. Every checkpoint carries its paragraph, so the form doubles as the reference for a rigger who has not read Subpart H lately.
- 4For hooks, shackles and round slings, use the manufacturer's criteria. OSHA sets no dimensional reject limits for that hardware — only the hook throat and twist figures that appear in 1910.184(e)(9)(ii) and (f)(5)(vi) for slings. Group G names the manufacturer and ASME B30.26 instead of inventing a number.
- 5Log what came out and where it went. Then print or download the PDF and sign it. Plan the lift itself with the sling tension calculator and the load weight estimator, and put the rigging steps in a JHA.
What OSHA requires
Two sentences carry the whole inspection duty. 29 CFR 1926.251(a)(1): “Rigging equipment for material handling shall be inspected prior to use on each shift and as necessary during its use to ensure that it is safe. Defective rigging equipment shall be removed from service.” And 1926.251(a)(6): “Each day before being used, the sling and all fastenings and attachments shall be inspected for damage or defects by a competent person designated by the employer. Additional inspections shall be performed during sling use, where service conditions warrant. Damaged or defective slings shall be immediately removed from service.” The general industry equivalent is 1910.184(d), word for word.
What the standard then does — and what makes an inspection form possible at all — is name the conditions that force a removal, sling type by sling type. Those lists are what group A to F of the form are made of.
| Sling type | Construction (1926) | General industry (1910) | On this form |
|---|---|---|---|
| Alloy steel chain | 1926.251(b)(5) and Table H-1 (wear); (b)(6) periodic inspection | 1910.184(e)(9) — cracked or deformed links, hook throat and twist | Group B |
| Wire rope | 1926.251(c)(4)(iv), (c)(14), (c)(16) | 1910.184(f)(5)(i)–(vii) — the seven-condition list | Group C |
| Synthetic web | 1926.251(e)(8)(i)–(v) | 1910.184(i)(9)(i)–(v) — identical list | Group D |
| Natural and synthetic fiber rope | 1926.251(d)(6)(i)–(vi) | 1910.184(h)(5)(i)–(vi) — identical list | Group E |
| Metal mesh | Named in scope, (a)(5); no reject criteria in 1926 | 1910.184(g)(9)(i)–(vii) | Group F |
| Synthetic round slings | Not in the scope list of (a)(5) | Not covered | Group G — manufacturer and ASME B30.9 |
| Hooks, shackles, eye bolts, links | 1926.251(f)(1)–(2) — markings and manufacturer's recommendations only | Hook throat and twist figures appear in (e)(9)(ii) and (f)(5)(vi) | Group G — manufacturer and ASME B30.26 |
Table H-1 — maximum allowable wear at any point of a chain link
Reproduced from 29 CFR 1926.251. Whenever wear at any point of any link exceeds the figure for that chain size, 1926.251(b)(5) requires the assembly to be removed from service.
| Chain size (in) | Max. allowable wear (in) | Chain size (in) | Max. allowable wear (in) |
|---|---|---|---|
| 1/4 | 3/64 | 1 | 3/16 |
| 3/8 | 5/64 | 1-1/8 | 7/32 |
| 1/2 | 7/64 | 1-1/4 | 1/4 |
| 5/8 | 9/64 | 1-3/8 | 9/32 |
| 3/4 | 5/32 | 1-1/2 | 5/16 |
| 7/8 | 11/64 | 1-3/4 | 11/32 |
The standard requires the inspection, not a particular form, and sets no retention period for the shift or daily inspection. The one record it does require is the month of the most recent thorough periodic inspection of each alloy steel chain sling, 1926.251(b)(6)(ii). ASME B30.9 and B30.26 are named here and not reproduced; where they or a manufacturer's instructions are stricter than OSHA, the stricter criteria govern the gear you own.
Frequently asked questions
Sources & references
- 29 CFR 1926.251 — Rigging equipment for material handling (construction), incl. Table H-1
- 29 CFR 1910.184 — Slings (general industry), incl. the removal-from-service lists
- OSHA — Advanced Rigging Principles Training Course, Student Workbook
- OSHA — Guidance on Safe Sling Use, tables and figures
- ASME B30.9 (slings) and B30.26 (rigging hardware) — paid consensus standards, named here and not reproduced; they are where the reject criteria for round slings and hardware live