Skip to content
STEELTOE
TOOLS
Search tools
Calculators
Permits & Forms
Toolbox Talks
Practice Tests
STEELTOE
TOOLS
Search tools
Calculators
Permits & Forms
Toolbox Talks
Practice Tests
Training
Blog
Home
/
Toolbox Talks
/
Excavation & Trenching
Excavation & Trenching toolbox talks
6 talks
All
Falls & Ladders
PPE
Tools & Equipment
Heat & Cold Stress
Electrical
Excavation & Trenching
Fire & Hot Work
HazCom & Chemicals
Health & Ergonomics
Housekeeping & General
Driving & Vehicles
Forklifts & Mobile Equipment
10 min
Water in the Trench
Accumulating water, pumps monitored by a competent person, diversion, and why wet ground is Type C.
10 min
Getting Out: Trench Access and Egress
4 feet triggers a way out, 25 feet of lateral travel is the limit, and the ladder moves with the work.
10 min
Spoil Piles and the 2-Foot Setback
The 2-foot minimum, equipment counts too, and why a pile at the edge forces a flatter slope.
10 min
Soil Classification: One Look, One Test
Why Appendix A takes one visual AND one manual analysis, the field tests, and why hard dry sand is still Type C.
10 min
Call 811 Before You Dig
Locate tickets, the APWA color code, the tolerance zone and private lines — what 1926.651(b) requires before the first bucket.
10 min
Trench Protection at 5 Feet
The 5-foot rule, the two exceptions, slope/shore/shield, egress within 25 ft and the daily inspection.