Hazards: Electric shock and electrocution from a damaged cord · Ground path lost through a missing ground prong · Fire from an overheated or pinched cord · Trip and fall from cords in walkways

Why it matters

Ordinary voltage is what hurts most people. Of nonfatal direct-contact electrical injuries in construction from 2011 to 2019, only 15.1% involved more than 220 volts — the rest happened at the voltage running through every cord on this site (BLS survey data, CPWR Data Bulletin, November 2022).

On April 9, 2022, a worker digging under a house plugged a drop light into his extension cord to see better (OSHA Accident Search, Summary Nr 145407.015). The light had cuts in its cord, a missing ground pin and a failed strain relief. He plugged his chipping hammer into that light and was electrocuted. Every one of those defects is on the list you look for before the shift.

Key points

  • Look at every cord before the day's use. 1926.404(b)(1)(iii)(C) and 1910.334(a)(2)(i): check for external defects — deformed or missing pins, cut jacket, loose parts.
  • Read the jacket. 1926.405(g)(2)(ii): S, SO, ST, SJ and the rest must be durably marked with type, size and number of conductors. An unmarked household cord is not jobsite cord.
  • Taped splices are not repairs. (g)(2)(iii): cords are used in continuous lengths without splice or tap. Only hard service cord No. 12 or larger may be repaired, and the splice must restore insulation and outer sheath.
  • Pull the plug, not the cord. (g)(2)(iv) requires strain relief so tension never reaches the terminals. A plug that spins or shows copper has already lost it.
  • Cord is not building wiring. (g)(1)(iv): not through walls, ceilings, floors, doorways or windows, not fastened to the building. 1926.416(e)(2): no staples, no nails, no wire.
  • Bad cord leaves today. 1926.416(e)(1): worn or frayed cords shall not be used. Cut the plug off and bin it, or it comes back out of the gang box tomorrow.

Do / Don't

Do

  • Lay the cord out flat and run it through your hands before you plug it in.
  • Route it overhead or along a wall, hung on non-conductive hooks.
  • Keep every cord out of standing water, mud and drive lanes.
  • Tag and remove any cord you would not want your own hands on.

Don't

  • Cut off a ground prong to make a plug fit.
  • Tape over a nick and keep using the cord.
  • Daisy-chain three light-duty cords to reach the far corner.
  • Hang a cord on a nail or staple it to a stud.

Quick site check

  • Empty the gang box, lay every cord out and pull the failures now — before someone needs one in a hurry.
  • Walk the run from the receptacle to the tool: doorways, standing water, pinch points under a plate or a wheel.
  • Check the plug ends for missing prongs, cracked bodies, and a jacket that still grips the plug.
Discussion — ask the crew
  1. Pick up the cord closest to you right now and look at the plug end: all three prongs, no cracks, no tape over a splice?
  2. Where on this site are we running cord through a doorway, a window, or a hole in a wall today?
  3. Who inspected the cords in the gang box before this shift, and what did they do with the bad ones?
  4. If you found a cord with a cut jacket right now, where would you put it so nobody plugs it back in an hour from now?
  5. Are the cords we are using marked S, SO, ST or SJ on the jacket, or did somebody bring a household cord from home?
Refs: 29 CFR 1926.404(b)(1)(iii) — Assured equipment grounding conductor program: daily visual inspection of cord sets · 29 CFR 1926.405(g) — Flexible cords and cables: permitted uses, prohibited uses, type marking, splices, strain relief · 29 CFR 1926.416(e) — Worn or frayed cords; no staples, nails or wire · 29 CFR 1910.334(a) — Portable electric equipment: handling, visual inspection before each shift, grounding-type equipment · OSHA Accident Search — Summary Nr 145407.015, event date 04/09/2022 · CPWR Data Bulletin, November 2022 — Electrical Injuries and Citations in ConstructionSign-in sheet included in the printed version

Frequently asked questions

Before each day's use on a construction site under 1926.404(b)(1)(iii)(C), and before each shift in general industry under 1910.334(a)(2)(i). It is a visual check for external defects: deformed or missing pins, damage to the outer jacket, loose parts.

Only hard service cord No. 12 or larger, and only if the splice retains the insulation, outer sheath properties and usage characteristics of the cord, under 1926.405(g)(2)(iii). Otherwise flexible cords must be used in continuous lengths without splice or tap.

No. 1926.405(g)(1)(iv) prohibits running flexible cord through holes in walls, ceilings or floors, and through doorways or windows, except where it is temporary wiring installed and protected under 1926.405(a)(2).

They are the cord type. 1926.405(g)(2)(ii) requires S, SO, ST, STO, SJ, SJO, SJT and SJTO cords to be durably marked on the surface with the type designation, size and number of conductors. S types are hard service; SJ types are junior hard service.

The cord itself is not. A missing ground prong means the equipment grounding conductor is no longer continuous, which 1910.334(a)(3)(ii) prohibits. Take the cord out of service regardless of what is plugged into it.

Sources & references

Content checked against these sources — last reviewed August 28, 2026.

Results are estimates for planning purposes and do not replace a competent person's evaluation or an engineer's design. Follow the OSHA standards that apply to your work and your employer's written program.

By — Editorial team of SteelToeTools.com (published by LSEA SAS) Updated