Energized Electrical Work Permit Generator

Under 29 CFR 1910.333(a)(1) live parts are deenergized before work, and the employer must be able to demonstrate why an exception applies. This permit records that demonstration, the safety-related work practices actually verified on site, and the signatures. Every field cites its paragraph of the Code of Federal Regulations. Nothing you type is sent to our servers.

Deenergizing is the rule. Under 29 CFR 1910.333(a)(1), live parts are deenergized before an employee works on them. This permit exists to document the narrow case where the employer can demonstrate that deenergizing would introduce additional or increased hazards, or is infeasible. If neither applies, the answer is a lockout, not a permit.

A qualified person must be able to determine this (1910.332(b)(3)(ii)).
Most programs limit a permit to one task, one shift.
Type of energized work

Nothing you type is sent to our servers. A draft is kept in this browser until you clear it.

Template for informational purposes only. This document must be reviewed and adapted by a competent or qualified person for your specific jobsite, equipment, and applicable federal, state, and local requirements. It does not constitute legal, engineering, or safety advice and does not by itself establish compliance with OSHA or any other standard. SteelToeTools assumes no liability for its use. Nothing you type is sent to our servers.

How to use this permit

  1. 1
    Start by trying to avoid it. 1910.333(a)(1) makes deenergizing the default. The first question is not "how do we work it live" but "what stops us from shutting it down".
  2. 2
    Write the justification in plain words. One of the two grounds, then the specific hazard or limitation. "Production" is not a ground; "the process cannot be restarted without venting the reactor" might be.
  3. 3
    Walk the checklist on site, not at a desk. Each line is a paragraph of 29 CFR. Anything you cannot verify stays unchecked and the permit shows it.
  4. 4
    Sign before, and close after. The qualified persons and the authorizing person sign before work starts. The last line is signed when the equipment is back to normal and the area is released.
  5. 5
    File it with your electrical safety program. The permit is evidence that the exception in 1910.333(a)(1) was assessed, not assumed.

What OSHA requires — and what this permit is not

OSHA has no paragraph called "energized electrical work permit". The document exists because 29 CFR 1910.333(a)(1) puts the burden on the employer to demonstrate that deenergizing is not possible, and a written permit is how most employers carry that burden. The energized work permit as an industry practice comes from NFPA 70E, a private consensus standard that OSHA references but does not publish; its form and its content are copyrighted and are not reproduced here. Every field and every checklist line below comes from the Code of Federal Regulations, which is public domain.

What the CFR requires for work on or near exposed energized parts
RequirementSource
Live parts are deenergized before work, unless the employer can demonstrate that deenergizing introduces additional or increased hazards, or is infeasible due to equipment design or operational limitations29 CFR 1910.333(a)(1)
Parts under 50 volts to ground need not be deenergized if there is no increased exposure to electrical burns or to explosion due to electric arcs1910.333(a)(1), exception
Where parts stay energized, other safety-related work practices must protect employees against direct and indirect contact1910.333(a)(2)
Only qualified persons may work on electric circuit parts or equipment that have not been deenergized1910.333(c)(2)
Qualified persons are trained to identify exposed live parts, determine the nominal voltage, and know the clearance distances for that voltage1910.332(b)(3)
Minimum approach distances by voltage for qualified persons; 10 ft for unqualified persons near exposed energized overhead lines up to 50 kV1910.333(c)(3)(ii) and Table S-5; (c)(3)(i)(A)
Illumination adequate; no reaching blindly into areas that may contain energized parts1910.333(c)(4)
Confined or enclosed spaces with exposed live parts: shields, barriers or insulating materials; doors and panels secured1910.333(c)(5)
Conductive materials handled to prevent contact; nonconductive ladder siderails; conductive apparel removed; no housekeeping close to live parts1910.333(c)(6)–(c)(9)
Electrical protective equipment provided, maintained and inspected or tested; nonconductive head protection; eye and face protection against arcs and flashes1910.335(a)(1)(i)–(v); 1910.137
Insulated tools and handling equipment; nonconductive ropes and handlines; shields, barriers and insulating materials1910.335(a)(2)
Safety signs and tags, barricades, and an attendant where signs and barricades are not enough1910.335(b)(1)–(3)
A circuit that a protective device opened is not manually reenergized until it is determined the equipment and circuit can be safely energized; repetitive reclosing is prohibited1910.334(b)(2)
Construction: no work in proximity to a power circuit unless protected by deenergizing and grounding, or by effective guarding; tags on controls, equipment and circuits1926.416(a)(1); 1926.417
Where 1910.269 or 1926 Subpart V applies, the employer estimates incident heat energy and provides arc-rated protection above 2.0 cal/cm²; clothing that melts or ignites is excluded1910.269(l)(8); 1926.960(g)

Approach boundaries, PPE categories and incident-energy tables outside 1910.269 and 1926 Subpart V are not published by OSHA. Your employer's electrical safety program — commonly built on NFPA 70E — sets them. Ask for yours; this page will not invent one.

Frequently asked questions

No paragraph of 29 CFR uses that name. What OSHA requires is in 1910.333(a)(1): live parts are deenergized before work unless the employer can demonstrate that deenergizing would introduce additional or increased hazards, or is infeasible due to equipment design or operational limitations. A written permit is how most employers document that demonstration, and it is the practice NFPA 70E describes.

Only the two grounds in 1910.333(a)(1). The notes give the examples OSHA has in mind: interruption of life support equipment, deactivation of emergency alarm systems, shutdown of hazardous location ventilation, a circuit that can only be tested while energized, and a circuit that is an integral part of a continuous industrial process where a complete shutdown would be needed. Schedule pressure and cost are not on that list.

1910.333(a)(1) allows live parts operating at less than 50 volts to ground to stay energized where there is no increased exposure to electrical burns or to explosion due to electric arcs. The permit has a field for it so the decision is recorded rather than assumed.

Because OSHA does not publish them for general industry or construction work outside 1910.269 and 1926 Subpart V. Those boundaries and clothing categories come from NFPA 70E, a private consensus standard that is copyrighted; reproducing its tables here would be wrong on both counts. The permit has fields for the approach distance and boundary your own program sets.

This template provides four lines: the qualified person doing the work, a second qualified person or attendant, the person authorizing the work, and a close-out signature when the equipment is returned to normal and the area is released. Your program may require more; add them before you issue it.

There is no federal duration. Most electrical safety programs limit a permit to one task on one shift, which is why the form asks for a start and an expiry time. Re-issue rather than extend.

No. The permit is built in your browser and the PDF is generated on your device. A draft stays in this browser until you clear it.