Excavation Volume & Truckload Calculator

The hole and the haul are two different numbers. Enter the excavation and the soil, and this calculator gives the bank volume in the ground, the loose volume once it is dug and on the truck, and how many loads that becomes at your body capacity. Swell factors are measured values from a state DOT study, shown with their full range — because on clay that range decides the truck count.

ft
ft
ft
Average, not maximum. A sloped or benched excavation removes more than the plan area suggests — measure or model it.
yd³
Loose volume the body actually holds, from the truck's own spec — not a rule of thumb. Heaped and struck capacities differ.
lb/ft³
Leave at 0 unless you have a real figure. We publish no soil density: from a geotechnical report, a nuclear gauge test or a weighed load only.
tons
Gross vehicle weight rating minus tare, from the truck's plate and your state's limits. Leave at 0 to skip the weight check.

Results are estimates for planning purposes. Verify with your supplier, engineer, or a qualified professional before ordering material or performing work.

Swell factors by soil type

Bank-to-loose expansion is the number that turns a hole into a haul. These are measured values: a WisDOT research team sampled Wisconsin soils, ran Proctor and in-situ density tests, and measured the loose state with a unit box. Beside them is what the same agency's general guidance says — and the study's own conclusion is that the two do not always agree.

Measured bank-to-loose expansion by soil classification, against WisDOT's generalized guideline values
SoilUSCSMeasured swellWisDOT guideline
Sand with gravelSW-SM, SM16–23%—
Clean sandSP4–8%10–15%
Silty sandSM, SP-SM, SC-SM2–27%15–25%
SiltML27%20–30%
ClayCL, CH26–58%25–35%

Measured values from Table 4.10 of WHRP G22-05 (WisDOT, December 2023); guideline values from Table 1.1 of the same report. The study also found that only about 31% of the state DOTs it surveyed use specific expansion values for natural soils at all — most work from experience. That is why a swell number is so hard to find, and why the spread on silty sand and clay is wide enough to change your truck count.

Bank, loose, compacted: three yards, one ton

Every earthwork argument comes from someone quoting one state and someone else hearing another. The mass never moves; only the air between the particles does.

  • Bank — in the ground, undisturbed. This is the hole on the plan, and normally the pay quantity for excavation.
  • Loose — in the stockpile or the truck, after the bucket has broken it up. This is what you haul, what the landfill scale weighs, and what fills a body.
  • Compacted — placed and rolled in lifts. Denser than bank for most soils, which is why a fill takes more borrow than its own volume. The same study measured that compacted-to-bank step at 9–10% for a clean sand and anywhere from −5% to 9% for clay: in eastern Wisconsin, some clays were already at or above their Proctor maximum in the ground.

The limit that bites first is pounds, not yards

A body is rated in cubic yards, but a highway is regulated in pounds. On the Interstate System and reasonable access to it, 23 CFR 658.17 caps a vehicle at 80,000 lb gross, 20,000 lb on any single axle and 34,000 lb on a tandem, with the Federal Bridge Gross Weight Formula governing consecutive axle groups. States set their own limits off the Interstate, and permits exist for nondivisible loads — dirt is not one.

Wet clay reaches those numbers with the body only part full. That is why this calculator will run the weight check for you the moment you give it a density and a payload limit, and why it will tell you which of the two governs instead of quietly picking one. What it will never do is invent a density for your soil: FHWA's own soils manual puts a clean sand between 85 and 138 lb/ft³ on packing alone.

Where the pile goes

The spoil you do not haul away is still on your site, and if it sits at the edge of an open excavation it is a load on the wall. 29 CFR 1926.651(j)(2) requires spoil, materials and equipment to be kept at least 2 ft back from the edge, or held by a retaining device, or both. If the loose yardage on this page is larger than the room you have, that is a plan to make now and not at 7 a.m. Size the excavation itself with the trench slope calculator.

How it's calculated

Bank volume, the hole in the ground
rectangle: A = length × width · circle: A = π / 4 × diameter² · triangle: A = base × height / 2; V bank (ft³) = A × depth (ft) → yd³ = ft³ / 27
Loose volume, what comes out
V loose = V bank × (1 + swell % / 100)
Measured bank-to-loose expansion by soil classification: sands with gravel 16–23%, clean sands 4–8%, silty sands 2–27%, silts 27%, clays 26–58%. The midpoint drives the result; the range is shown beside it.
Truckloads
loads = ceiling( V loose / truck body capacity )
Always rounded up: half a load still sends a truck. If you also enter a density and a payload limit, the weight-limited count is calculated too, and the larger of the two governs.
Weight, only from your own density
tons = V bank (ft³) × in-place density (lb/ft³) / 2,000
Weight is invariant: swell changes the volume, never the mass. No default density is offered for soil — none is publishable. FHWA's own soils manual puts a clean sand anywhere between 85 and 138 lb/ft³ on packing alone.
The limit that usually bites first
80,000 lb gross · 20,000 lb single axle · 34,000 lb tandem axle
23 CFR 658.17, on the Interstate System and reasonable access to it. Wet clay fills the weight before it fills the body: the body capacity is the answer only until the scale says otherwise.

Frequently asked questions

The hole is 600 cubic feet, or 22.2 bank cubic yards. In silty sand, which the WisDOT study measured expanding 2% to 27%, that comes out as roughly 22.7 to 28.2 loose cubic yards — two to three loads in a 12 cubic yard body. The soil, not the hole, is what makes that answer a range.

Because digging it puts air into it. Soil in the ground is packed by everything that ever sat on top of it; the moment a bucket breaks it up, the same mass takes more room. The WisDOT study measured that bank-to-loose expansion at 4% to 8% for a clean sand and 26% to 58% for clay. It comes back down when you compact it — that is the same effect running in reverse.

The percentage increase in volume from the bank state, meaning soil undisturbed in the ground, to the loose state, meaning soil in a stockpile or a truck. A 25% swell factor says a cubic yard of hole becomes 1.25 cubic yards on the truck. The mass never changes — only the air between the particles does.

That is a question for the truck, not for the internet. Body capacity depends on the body, and manufacturers publish struck and heaped figures that differ from each other. Get it off the spec, put it in the field above, and you have an answer that matches the trucks actually on your job.

Because federal limits are set in pounds, not cubic yards. 23 CFR 658.17 caps a vehicle at 80,000 lb gross, 20,000 lb on a single axle and 34,000 lb on a tandem on the Interstate System and reasonable access to it. Wet clay is heavy enough to reach those numbers with the body only part full. Enter a density and a payload limit and this calculator tells you which limit governs.

Because there isn't one worth giving. FHWA's own soils manual puts the dry unit weight of a clean fine-to-coarse sand anywhere from 85 to 138 lb per cubic foot depending only on how densely it is packed, and moisture moves it again. A number in the middle of that range would look authoritative and be wrong most of the time. Use your geotechnical report, a nuclear gauge result, or weigh a load and divide.

Both, and for different lines. Excavation is normally paid by bank measure, because that is the hole in the plan. Hauling and disposal are sized by loose measure, because that is what the truck carries and what the landfill scale sees. Quoting one where the other belongs is the classic way to lose money on a dirt job.

Only through the average depth you enter. A sloped or benched excavation is wider at the top than at the bottom, so the real volume is larger than length by width by depth at the trench line. Model it as an average, or work the slope out first with the trench slope calculator and use the resulting top width here.