Skip to content
STEELTOETOOLS

Mortar Calculator

Enter the wall area or the number of units you are laying and this calculator returns the mortar to buy: bags, sand for a site-mixed batch, and mixing water. Every yield comes from a published source — NCMA's estimating tables for block, the Brick Industry Association's mortar volumes for brick, the data sheet for bagged mix.

ft²
units
If you already counted your block or brick, enter the count and the wall area is ignored.
%
The published yields already include a nominal waste allowance. Add more for many corners and returns, hot weather, or a green crew.

Results are estimates for planning purposes. Verify with your supplier, engineer, or a qualified professional before ordering material or performing work.

Published mortar yields

Units laid per batch of mortar, NCMA TEK 4-2A Table 2 and the QUIKRETE Mason Mix data sheet
MortarConventional blockBrick-sized unitsPer 100 block
70 lb bag masonry cement + sand301,0004 bags + 0.4 ton sand
80 lb bag preblended mortar16507 bags
3,000 lb bulk bag preblended4201,5500.24 bulk bag
80 lb bag QUIKRETE Mason Mix1337 standard bricks8 bags

First three rows: NCMA TEK 4-2A Table 2 — face shell bedding for conventional block, full bedding for brick-sized units, nominal waste included. Last row: QUIKRETE Mason Mix No. 1136 data sheet. The spread between the preblended figures is real: it depends on the bag, the mason and the joint, which is why the yield printed on your product wins over any calculator.

Mortar volume for brick

Cubic feet of mortar per 1,000 brick, BIA Technical Notes 10 Table 4
BrickPer 1,000 brick, 3/8 in joint1/2 in jointPer 100 ft² of wall, 3/8 in
Modular8.1 ft³10.3 ft³5.5 ft³
Standard14.5 ft³17.8 ft³9.5 ft³
Queen12.2 ft³13.5 ft³6.7 ft³
King14.2 ft³16.0 ft³6.5 ft³
Utility12.3 ft³15.7 ft³3.7 ft³

BIA Technical Notes 10 Table 4 — the theoretical volume of mortar in the wall for fully bedded solid units, before waste. BIA's own instruction is to add 15 to 25%. Note how much more mortar the published figures give to non-modular sizes at the same joint thickness: that is what the table says, and it is one more reason to price the mortar off the size you are actually buying. Full brick line-up in the brick calculator.

Mortar types and site-mix proportions

Portland cement-lime mortar proportions and minimum compressive strengths
TypePortland cement-lime proportions (by volume)Conventional block per batchMinimum compressive strength, ASTM C270
M1 ft³ cement : ¼ ft³ lime : 3¾ ft³ sand382,500 psi
S1 ft³ cement : ½ ft³ lime : 4½ ft³ sand461,800 psi
N1 ft³ cement : 1 ft³ lime : 6 ft³ sand62750 psi
O1 ft³ cement : 2 ft³ lime : 9 ft³ sand93—

Proportions and units-per-batch: NCMA TEK 4-2A Table 2. Strengths: the property requirements of ASTM C270 as published on the QUIKRETE Mason Mix data sheet. Which type your wall needs is a specification decision — ASTM C270 Appendix X1 is the guidance document, and the answer comes from your drawings, not from a calculator. Field conversions from NCMA: a bag of portland cement is 1 ft³ and 94 lb; a bag of mason's lime is 1¼ ft³ and 50 lb; a ton of damp loose sand is about 25 ft³, and 1 ft³ of sand is roughly seven shovelfuls.

On the wall

  • Mortar is not grout, and neither is concrete. Mortar goes in the joints, grout fills the cells, concrete goes in forms. They are three products with three consistencies and three specifications.
  • Face shell or full bed changes the number. NCMA's block yields assume face shell bedding — mortar on the two face shells only. Full bedding, which brick-sized units and the first course get, uses noticeably more.
  • Mix it long enough. QUIKRETE calls for a minimum of five minutes of mixing, and the consistency test is a half-inch layer that stays on a trowel held near vertical.
  • Water past the maximum costs strength. The data sheet's maximum expected water content is below 7 quarts for an 80 lb bag. Retempering water is not free.
  • Order the last bag you think you need, plus one. Every published yield in this page carries the caveat that the mason's skill, corners, returns and non-modular layout move the number.

How it's calculated

Units from wall area
units = area (ft²) / unit face area (ft²)
Nominal face areas: 8/9 ft² for a conventional block, 4/9 ft² for a half-high or half-length block, 4/27 ft² for a brick-sized unit. Brick counts come from BIA Table 4: 675 modular, 655 standard, 550 queen, 455 king or 300 utility per 100 ft².
Bags of mortar for block
bags = ceiling( units × (1 + extra % / 100) / units per batch )
Units laid per batch, face shell bedding: 30 conventional block per 70 lb bag of masonry cement, 16 per 80 lb preblended bag, 420 per 3,000 lb bulk bag, 13 per 80 lb bag of QUIKRETE Mason Mix. Brick-sized units are laid in a full bed: 1,000, 50, 1,550 and 37 respectively.
Sand for a site-mixed batch
sand (tons) = units / 240 ; 1 ton damp loose sand = 25 ft³
NCMA: 1 ton of masonry sand per 8 bags of masonry cement, about 240 conventional units per ton; above 3 tons add half a ton for waste.
Mortar volume for brick
mortar (ft³) = brick / 1000 × ft³ per 1000 brick × (1 + extra % / 100)
BIA Table 4, theoretical mortar in the wall before waste: modular 8.1 ft³ per 1,000 at a 3/8 in joint and 10.3 at 1/2 in; standard 14.5 and 17.8; queen 12.2 and 13.5; king 14.2 and 16.0; utility 12.3 and 15.7. BIA's instruction is to add 15 to 25% for waste.
Mixing water
water = 5 qt per 80 lb bag of QUIKRETE Mason Mix (7 qt maximum), 3¾ qt per 60 lb bag (5¼ qt maximum)
From the data sheet. Mix at least 5 minutes; the mortar is right when a 1/2 in layer stays on a trowel held near vertical.

Frequently asked questions

It depends on the mix, and the published figures differ: NCMA gives 30 conventional blocks per 70 lb bag of masonry cement, so about 4 bags per 100 blocks plus roughly 0.4 ton of sand; 16 blocks per 80 lb bag of preblended mortar, so about 7 bags; QUIKRETE publishes 13 blocks per 80 lb bag of Mason Mix, so about 8 bags.

For modular brick with 3/8 in joints, BIA gives 8.1 ft³ of mortar in the wall per 1,000 brick, and instructs you to add 15 to 25% for waste — call it 10 ft³. Standard brick is published at 14.5 ft³ per 1,000 at the same joint thickness.

They are different proportions and different minimum compressive strengths under ASTM C270: 750 psi for Type N, 1,800 psi for Type S, 2,500 psi for Type M. Which type belongs on your wall is a specification decision — ASTM C270 Appendix X1 is the guidance document, and your drawings or the mortar supplier make the call, not a calculator.

NCMA works from one ton of masonry sand per 8 bags of masonry cement — about 3 ft³ of damp loose sand per bag, since a ton is roughly 25 ft³. Above 3 tons on a job, add half a ton for waste.

QUIKRETE's Mason Mix data sheet calls for about 5 quarts of clean water per 80 lb bag and 3¾ quarts per 60 lb bag, with a maximum expected water content below 7 and 5¼ quarts respectively. Mix at least five minutes.

Because that is how the sources publish it. NCMA publishes how many block one batch lays; BIA publishes cubic feet of mortar per 1,000 brick. Converting one into the other means inventing a yield, and the published bag figures for brick disagree by a wide margin — so we give you the volume and the bag figures side by side, each with its source.

No. Filling cells is grouting, and grout is a different material with a different consistency and a different strength requirement. Mortar goes in the joints; grout goes in the cells. The concrete block calculator handles grout volume separately.

Sources & references

Content checked against these sources — last reviewed August 29, 2026.

By — Editorial team of SteelToeTools.com (published by LSEA SAS) Updated v1