Concrete Stairs Calculator
Enter the number of risers, your rise and tread run, the width and the throat, and this calculator returns the concrete volume for the stair — cubic yards to order, bag count and weight. The rise and run are yours: this tool converts the geometry you enter, it never tells you what the geometry should be.
Results are estimates for planning purposes. Verify with your supplier, engineer, or a qualified professional before ordering material or performing work.
The two shapes, and why the volume differs
A stair is a prism: work out the cross-section once, multiply by the width. What changes between jobs is the underside.
- Suspended slab. The underside is a plane. The section is the big wedge (total rise × total run ÷ 2), plus one half-step triangle per tread — the sawtooth that sits above that plane — plus the throat, which is a constant thickness measured perpendicular to the slope, so it multiplies the slope length √(H² + L²).
- On grade. The excavation or the fill is cut square under each step, so every tread strip is a block standing on the base: 1, 2, 3 … times the rise. The section is rise × run × treads × (treads + 1) ÷ 2.
Both are in the selector. If your stair sits on compacted fill that follows the slope, the suspended figure with a small throat is the closer model; if the crew is stepping the subgrade, use the on-grade figure. When you are unsure, price the larger of the two — running short mid-pour on a stair is a cold joint across the nosing.
Worked examples, 4 ft wide, 7 in rise, 11 in tread
| Risers | Treads | Total rise | Suspended, 5 in throat | On grade |
|---|---|---|---|---|
| 3 | 2 | 21 in | 0.47 yd³ | 0.24 yd³ |
| 4 | 3 | 28 in | 0.82 yd³ | 0.48 yd³ |
| 5 | 4 | 35 in | 1.24 yd³ | 0.79 yd³ |
| 6 | 5 | 42 in | 1.74 yd³ | 1.19 yd³ |
| 7 | 6 | 49 in | 2.32 yd³ | 1.66 yd³ |
| 8 | 7 | 56 in | 2.99 yd³ | 2.22 yd³ |
Net volume from the geometry, before any waste allowance, with the top riser landing on an existing slab. These are examples of the arithmetic, not a recommended stair: the rise and run in your job come from your drawings and the code your jurisdiction adopted.
Before you pour
- Order more than the paper volume. NRMCA TIP 8, citing ASTM C94, lists why the truck comes up short: waste, spillage, loss of air content, settlement, form deflection, over-excavation. A stair has forms on three sides and a lot of edge — the waste field above is that allowance.
- Rise, run and reinforcement are not ours to set. Uniformity of rise, tread depth, nosing, handrails, bar size, cover and the footing under the stair all come from the adopted building code and your drawings. This page does arithmetic on the numbers you enter.
- Landings are a separate pour to calculate. A landing is a slab: length × width × thickness. The concrete slab calculator handles it, and the volumes simply add.
- Weight. At 145 lb/ft³ (NRMCA CIP 36 gives 140 to 150 for normalweight concrete), a 5-riser stair at 4 ft wide is close to 4,900 lb. Forms, ties and the ground under them carry that before it cures.
- Steel is counted separately. For bars and total weight in the stair and its footing, use the rebar calculator with the spacing on your drawings.
How it's calculated
- Geometry
total rise H (in) = risers × rise ; total run L (in) = treads × run ; treads = risers − 1 or risers- Cross-section, suspended stair
A (in²) = H × L / 2 + treads × rise × run / 2 + throat × √(H² + L²)The stepped mass above the sloped underside is the wedge H × L / 2 plus one half-step triangle per tread; the throat is the slab thickness measured perpendicular to the soffit, so it multiplies the slope length.- Cross-section, stair on grade
A (in²) = rise × run × treads × (treads + 1) / 2Each tread strip sits on a square-cut base, so its height above the bottom of the first riser is 1, 2, 3 … times the rise. This is the form volume when the excavation follows the steps rather than a slope.- Volume
V (ft³) = A (in²) / 144 × width (ft) ; yd³ = ft³ / 27- Volume to order
V order = V × (1 + waste % / 100)- Weight
weight (lb) = V (ft³) × 145 lb/ft³Normalweight concrete runs 140 to 150 lb/ft³ (NRMCA CIP 36). This calculator uses 145.- Bags
bags = ceiling( V order / yield per bag )QUIKRETE Concrete Mix No. 1101 yields 0.60 ft³ per 80 lb bag, 0.45 per 60 lb and 0.30 per 40 lb. Above roughly a cubic yard, bagged mix stops being reasonable: a yard is 45 bags of 80 lb, or 3,600 lb to carry and mix.
Frequently asked questions
Sources & references
- NRMCA CIP 36 — Structural Lightweight Concrete: normalweight concrete density range, 140 to 150 lb/ft³
- NRMCA TIP 8 — Concrete Yield: why the concrete placed exceeds the volume calculated from the dimensions (waste, spillage, over-excavation, form deflection, settlement), per ASTM C94
- QUIKRETE Concrete Mix No. 1101 — product data sheet: yield per bag and mixing water
Content checked against these sources — last reviewed August 29, 2026.