A cubic yard of normalweight concrete weighs about 3,780 to 4,050 lb — call it two short tons. The spread comes from density: NRMCA publishes 140 to 150 lb per cubic foot for normalweight concrete, and a cubic yard holds 27 cubic feet. At the usual working figure of 145 lb/ft³, a yard is 3,915 lb.

The weight chart

Everything below is the same arithmetic — density times volume — run at the ends and the middle of the range NRMCA gives for normalweight concrete in CIP 36.

Weight of normalweight concrete at 140, 145 and 150 lb/ft³
VolumeAt 140 lb/ft³At 145 lb/ft³At 150 lb/ft³
1 ft³140 lb145 lb150 lb
1 yd³ (27 ft³)3,780 lb3,915 lb4,050 lb
1 yd³, in tons1.89 tons1.96 tons2.03 tons
3 ft³ (a full wheelbarrow)420 lb435 lb450 lb
0.60 ft³ (an 80 lb bag, mixed)84 lb87 lb90 lb
10 yd³ (a full truck)37,800 lb39,150 lb40,500 lb

Two numbers are worth keeping in your head: 145 lb per cubic foot and 4,000 lb per cubic yard. Everything else is a multiplication. Need the volume first? The concrete slab calculator converts dimensions into cubic yards, and the cubic yards to tons converter does the same trip for aggregate.

Why the answer is a range, not a number

Concrete is aggregate, cement paste, water and air, and each one moves the density:

  • The aggregate. It is 60 to 75% of the volume, so its specific gravity mostly sets the density. A granite or trap rock mix lands high in the range; a limestone mix lands lower.
  • Air content. Entrained air is deliberate voids. Air-entrained concrete for freeze-thaw exposure carries several percent of air by volume, and every percent of air is a percent of weight that is not there.
  • Water and paste. A wetter, pastier mix is a lighter mix, because water weighs 62.4 lb/ft³ against 165-plus for stone.
  • Lightweight aggregate. Expanded shale, clay or slate changes the answer entirely — see below.

None of this is a reason to hunt for a more precise figure. If you need the real density of the concrete on your ticket, it is measured at the truck under ASTM C138, and your ready-mix supplier can tell you what their mix runs.

Fresh, cured, and the difference between them

Concrete loses a little weight as it cures and dries. NRMCA's CIP 36 puts numbers on it: equilibrium density — the in-service condition — is about 3 to 8 lb/ft³ below the fresh density measured on delivery. Over a cubic yard that is 80 to 215 lb, or 2 to 5%.

Which one do you want? For a delivery weight, a wheelbarrow, a form design or a crane pick, use the fresh weight — that is what is in front of you. For a dead load on a structure, the designer works from the equilibrium density, and the specification says which.

Lightweight concrete: 2,430 to 3,240 lb a yard

Structural lightweight concrete uses expanded shale, clay or slate aggregate fired in a rotary kiln to give it a porous structure. NRMCA's published range for equilibrium density is 90 to 120 lb/ft³, against 140 to 150 for normalweight — so a cubic yard runs 2,430 to 3,240 lb.

Normalweight versus structural lightweight concrete
NormalweightStructural lightweight
Density140-150 lb/ft³90-120 lb/ft³ (equilibrium)
Per cubic yard3,780-4,050 lb2,430-3,240 lb
Typical useSlabs on ground, footings, walls, pavementBridge decks, composite slabs on metal deck, topping slabs, tilt-up

The point of paying more per yard is to take dead load out of the structure: smaller columns, smaller footings, less steel for the same capacity. Non-structural lightweight mixes made with perlite, vermiculite or pumice, or cellular concrete, go lighter still and are used for their insulating value rather than their strength.

Bags, barrows and what your back feels

Bagged mix confuses the weight question because the number on the bag is the dry mix. An 80 lb bag of QUIKRETE Concrete Mix yields 0.60 ft³, which at 145 lb/ft³ weighs about 87 lb once you have added the roughly 6 pints of water the data sheet calls for. So:

  • A cubic yard from bags is 45 bags of 80 lb — 3,600 lb of dry mix to buy, carry, open and mix, before water.
  • A full wheelbarrow is around 435 lb at 3 ft³. Two of those is a cubic foot short of a quarter yard, and your wrists know it.
  • A 5 gallon bucket holds two thirds of a cubic foot — about 97 lb of concrete. That is why nobody fills one to the rim.

Past about a cubic yard, the weight is the argument for ready-mix, not the price.

Weight per square foot, by thickness

Slabs and decks are easier to think about per square foot than per yard: multiply the thickness in feet by 145 lb/ft³ and you have the dead load of the concrete itself, before reinforcement, finishes or anything standing on it.

Concrete weight per square foot at 145 lb/ft³, and the yards in 100 square feet
ThicknessWeight per ft²Per 100 ft²Cubic yards per 100 ft²
4 in48 lb4,833 lb1.23 yd³
5 in60 lb6,042 lb1.54 yd³
6 in73 lb7,250 lb1.85 yd³
8 in97 lb9,667 lb2.47 yd³
10 in121 lb12,083 lb3.09 yd³
12 in145 lb14,500 lb3.70 yd³

A 4 in slab is about 48 lb per square foot; every additional inch adds roughly 12 lb. It is the fastest sanity check there is on a takeoff — if your tonnage and your square footage do not agree with this table, one of the two numbers is wrong.

Where the weight actually matters on site

  • Elevated forms and shoring. A 6 in slab is 72 lb per square foot of dead load in concrete alone, before workers, tools or a pump line. Formwork and shoring are engineered for it.
  • The delivery. Ten yards of concrete is nearly 40,000 lb of payload, and the drum, water and truck sit on top of that. Access, soft ground and axle limits are all weight problems.
  • Picks and precast. A precast panel or a stair unit gets rigged by its weight: volume times density, then the sling angles. The load weight estimator runs that math for concrete and other materials.
  • Steel is a rounding error, until it isn't. A #4 mat at 12 in on centre in a 20 by 20 ft slab adds about 520 lb against 19,300 lb of concrete. Run your own with the rebar calculator; on a heavily reinforced element the steel is worth counting.
  • What you order versus what you place. NRMCA's TIP 8 lists why a paper volume comes up short at the truck — waste, spillage, loss of air content, settlement, form deflection, over-excavated subgrade. Weight per yard does not change; the number of yards does.

Bottom line

  • A cubic yard of normalweight concrete: 3,780 to 4,050 lb, about two short tons.
  • Per cubic foot: 140 to 150 lb, and 145 is the number to work with.
  • Cured concrete is 3 to 8 lb/ft³ lighter than fresh; structural lightweight is 90 to 120 lb/ft³.
  • Need the real figure for a submittal? It is measured at the truck under ASTM C138 — ask your supplier for their mix.

Frequently asked questions

A cubic yard of normalweight concrete weighs about 3,780 to 4,050 lb, or 1.9 to 2.0 short tons. That comes straight from the density range NRMCA publishes for normalweight concrete, 140 to 150 lb per cubic foot, times the 27 cubic feet in a yard.

140 to 150 lb, with 145 lb/ft³ the usual working number. A wheelbarrow holding 3 cubic feet is carrying about 435 lb of concrete.

Just under two short tons: 1.89 tons at 140 lb/ft³ and 2.03 tons at 150 lb/ft³. If someone tells you 'two tons a yard,' they are within a couple of percent.

Slightly. NRMCA notes that equilibrium density — the in-service condition once some of the mix water has left — runs about 3 to 8 lb/ft³ below the fresh density measured at the truck. On a cubic yard that is 80 to 215 lb.

Structural lightweight concrete has an equilibrium density of 90 to 120 lb/ft³, so a cubic yard runs 2,430 to 3,240 lb — roughly 20 to 40% lighter than normalweight. That weight saving is the whole reason it gets specified.

More than 80 lb, because you add water. An 80 lb bag yields 0.60 ft³, which weighs about 87 lb at 145 lb/ft³ — the 80 lb of dry mix plus roughly 6 pints of water.

Not much. A 20 by 20 ft slab 4 in thick holds about 19,300 lb of concrete; a #4 mat at 12 in each way adds about 520 lb of steel, under 3%. Steel matters to the crane pick and the delivery ticket, not to the concrete weight estimate.

Sources & references

Content checked against these sources — last reviewed August 28, 2026.

Editorial team of SteelToeTools.com (published by LSEA SAS)

Tools and guides researched against primary sources (OSHA, NIOSH, ACI, ASME, NFPA) and reviewed before publication.

Informational content, not legal, engineering or safety advice. Verify requirements with the standards cited and a qualified professional. See our editorial policy.

Keep reading